Ödül İstanbul Construction Progress

Ödül İstanbul Construction Progress 05.08.2019

  • A Block Ground floor slab formwork continues.
  • B Block 4th Floor 2.Corporation tunnel concrete was poured.
  • E Block 16th floor concrete was poured
  • G Block in-house cable desant manufacturing continues.
  • Construction of the H Block brick wall continues.
  • OP-07 1st Basement Floor Column Curtain Wall Construction continues.
  • OP-08 3rd Basement floor slab concrete was poured.
  • OP-09 3rd basement floor formwork construction continues.
  • OP-13 2nd part 3rd basement floor slab concrete was poured.